|
|
|
Service |
The traffic system of the industrial zone adopts the chessboard style road network system with all the supporting civic facilities laid underground in advance.
If the planned roads haven’t been completed during the construction of factories, the industrial zone shall undertake the synchronized constructions of temporary pavements, planned roads and enterprise workshops.
|
|
Standards |
|
Standards for roads within the industrial zone: |
|
Item |
Capacity |
|
Main road |
35-40 meters to the red line with green belts of 30meters on both sides |
|
Secondary main road |
24 meters to the red line, with green belts of generally 10 meters on both sides |
|
Side road |
16meters to the red line, with green belts of generally 5 meters on both sides |
|
|
|
|
|
| |
|